Which of these
Socialist Stiumlus welfare programs could have AB completed on it's own?
Airdrie Veterans Boulevard upgrade $2,670,910
Alix Major improvements - Village of Alix $823,416
Alliance Improvements to Highway 602 $170,132
Arrowwood Sanitary Lagoon Expansion $616,667
Aspen Beach Provincial Park Aspen Beach Provincial Park shower building upgrade $75,000 Athabasca Upgrading of the wastewater lagoon $553,668
Athabasca Alberta-Pacific Forest Industries Inc. (Al-Pac) - Grassland connectors, Athabasca $3,000,000
Banff Centre for Creativity and Innovation at the Banff Centre $15,000,000
Barrhead New sewage pumping station $325,124
Barrhead 46th Street water and wastewater system upgrades $781,062
Barrhead 48th Avenue sanitation and water - Barrhead $629,305
Barrhead No. 11 Correction Line upgrading $2,999,743
Bashaw Resurfacing of Highway 21 from south of Bashaw to Highway 53 $2,546,278
Bashaw Water main replacement and insulation $211,917
Bashaw Infrastructure Upgrading $594,266
Beaumont Street and avenue upgrade $3,000,000
Bellevue Residential street infrastructure upgrades - 208th Street $255,900
Benalto, Lousana Hamlets of Benalto and Lousana wastewater storage and treatment upgrades $838,169
Bentley Roads program and storm water management $1,625,400
Berwyn Water treatment plant upgrade - Berwyn $107,000
Big Horn to Canmore Highway 1 - rehabilitation east of Banff Park, east of the
Kananaskis River $1,742,038 Big Lakes Road resurfacing on Highway 679 $1,294,611
Big Lakes Drinking water system and sewer expansion $1,176,233
Birch Hills Resurfacing of Highway 49 $1,667,542
Bittern Lake Resurfacing of Highway 13 $2,478,953
Black Diamond Water and wastewater service improvements $247,690
Blackfalds Upgrade of Blackfalds Sewage Pumping Station $1,582,700
Blairmore Water and sewer replacement in the west end of Blairmore $641,381
Bonnyville Road resurfacing of Highway 659 $1,516,341
Bonnyville 45th Avenue rehabilitation $1,131,333
Bonnyville 53A Street infrastructure replacement project $418,333
Bonnyville Bridge on Highway 892 $411,898
Bonnyville No. 87 Local road improvements $2,508,333
Bow Island Watermain loop on 4th Street East $117,467
Bowden Infrastructure renewal on 23rd Street and Westview Crescent $632,405
Bowden Red Lodge water treatment plant upgrade $150,000
Bowden Westview Crescent Loop infrastructure replacement $602,290
Boyle Energy efficiency renovations to Boyle and District Community Centre $238,046
Boyle Boyle Arena Energy Efficiency Renovations $398,989
Bragg Creek Bragg Creek potable water treatment plant $1,370,033
Brazeau County Sunchild Road repairs $3,000,000
Buffalo Lake Métis Settlement Buffalo Lake Métis Settlement Museum and Cultural Interpretative Centre $1,093,713
Busby, Pickardville, Vimy, Fawcett, Jarvie and Pibroch Westlock County lagoon upgrades and maintenance $637,518
Cadogan Urban Access Road 108 - Cadogan access $347,271
Calgary Canada Sports Hall of Fame $15,000,000
Calgary Widening of Highway 2 interchange structure $1,970,851
Calgary Resurfacing of Highway 2 $1,971,459
Calgary Improvements to Highway 862 $275,500
Calgary Highway 2 - Deerfoot Trail $4,558,193
Calgary Widening of Deerfoot Trail $3,341,791
Calgary 7th Avenue rehabilitation $26,666,666
Calgary Light Rail Transit security system upgrade $2,000,000
Calgary Light Rail Transit traction power upgrades $10,000,000
Calgary Telus World of Science Centre $40,000,000
Calgary Athletic and Ice Complex at Canada Olympic Park (Calgary Centre of Sports Excellence) $40,000,000
Calgary Calgary Stampede Park $25,000,000
Calgary Public Transit in Calgary $90,000,000
Calgary Calgary Southeast Ring Road $100,000,000
Calgary Mount Royal University Conservatory of Music $20,000,000
Calgary National Music Centre $25,000,000
Calgary Completion of improvements to the grounds at the Calgary Heritage Park
* Calmar Road upgrading $1,161,000
Camrose County Highway 21 - Battle River Bridge $158,000
Camrose County Highway 616 roadwork $1,977,574
Canmore Resurfacing work on Highway 1 $1,502,809
Canmore Resurfacing work on Highway 1A $823,850
Carbon Improvements to Highway 836 $1,459,500
Cardston Resurfacing work on Highway 62 $1,432,491
Cardston Cardston outfall project $1,545,438
Cardston, Blood Indian Reserve #148 Resurfacing of Highway 5 from Cardston to south of Spring Coulee $2,156,437
Carstairs/ Olds/ Didsbury Community Broadband Engagement Sites $103,862
Cereal Village of Cereal and the Henry Kroeger Regional Water Services Commission water treatment plant $150,000
Cereal The Henry Kroeger Regional Water Service Commission (HKRWSC) Sheerness pump house $230,000
Cessford and District Cessford and District water line $1,186,666
Chestermere Resurfacing work on Highway 1A $654,265
Chinchaga Upgrade to Highway 58, East of Chinchaga River to Sixth Meridian $5,610,497
Chipman Road Program $243,362
City of Medicine Hat Rehabilitation of Highway 1 $2,390,000
Clairmont Clairmont main lift Station upgrading and force main - Grande Prairie $1,104,483
Clairmont Base Gravel and Pave Range Road 63 $1,520,252
Claresholm South sanitary sewer $1,022,000
Clearwater Resurfacing Highway 11 from Horburg to east of Horburg $2,087,285
Clearwater Chungo Road - Grading $750,000
Clearwater Sunchild Road resurfacing - Phase II $4,433,878
Clearwater County Highway 22 roadwork $7,785,000 Clearwater County Highway 22 - Lane construction $1,549,874
Clearwater County Rehabilitation of Highway 587 $720,000
Coalhurst Sanitary Sewer Trunk $401,000
Cochrane Resurfacing work on Highway 22 $1,372,896 Cochrane Resurfacing work on Highway 1A $795,704
Cochrane Centre Avenue complete street connector $3,000,000
County of Saint Paul Highway 41 - North Saskatchewan River Bridge $911,500
County of Thorhild Highway 661 roadwork $495,500
Crossfield Smith Avenue water/wastewater upgrades $631,320
Cypress Highway 1 - overpass rehabilitation $453,212
Cypress Highway 1 - overpass rehabilitation (eastbound lane) southeast of the Medicine Hat Boundary $453,212
Cypress Resurfacing work on Highway 524 $2,977,848
Cypress Water distribution lines in Walsh $939,166
Cypress County Highway 879 - South Saskatchewan River Bridge repair $251,018
Cypress County Rehabilitation of the westbound lane of Highway 1 $4,434,000
Cypress County Westside Water Co-op Limited - Rural water $2,929,166
Del Bonita Highway 62 (section 2) improvements $2,239,138
Devon Road improvements -
Devon $1,260,872
Didsbury North Industrial Area - Road Work and Storm Water Management $2,032,666
Donnelly Paving East Village Of Donnelly $756,666
Drumheller Paving of Highway 9, east of Highway 836 to east of Highway 840 $1,505,711
Drumheller Highway 9 - Resurfacing $147,110
Drumheller Badlands community facility $3,000,000
Dry Island Buffalo Jump Provincial Park Replacements of a water supply on Dry Island Buffalo Jump Provincial Park $17,500
Duchess Railway Avenue sewer upgrade $123,510
Eckville Stormwater management project $109,962
Eckville Town of Eckville Lift Station and Forcemain Upgrades $546,898
Edmonton Renovation of the Citadel theatre $2,652,100
Edmonton Go Community Centre $14,800,000
Edmonton Campsite upgrades at Smoke Iosegun Provincial Park $37,500
Edmonton Water tower replacement at Cypress Hills Provincial Park $50,000
Edmonton Highway improvements $392,500
Edmonton Highway improvements $715,071
Edmonton Improvements to Highway 16 $345,084
Edmonton Refurbish campground, group and day use areas in Sandy McNabb Campground in Kananaskis Country $1,500,000
Edmonton Trail upgrades at Lundbreck Falls Provincial Recreation Area $25,000
Edmonton Upgrading the Waskahigan Provincial Recreation Area $50,000
Edmonton Arterial road rehabilitation in various locations in Edmonton $2,866,666
Edmonton Improvements to stormwater quality on Groat Road basin $1,700,000
Edmonton New storm sewers and sewer system improvements $430,000
Edmonton North East Light Rail Transit Signal System upgrade $9,933,333
Edmonton Edmonton Transit-South Light Rail Transit Platform Extension to 5-Car Length $5,000,000 Edmonton Edmonton Transit - Eaux Claires Transit Centre Park and Ride $4,000,000
Edmonton Edmonton Transit - Lewis Estate Park and Ride Phase 2 $1,000,000
Edmonton Northlands Agricom Exhibition Facility Expansion $25,000,000
Edmonton Edmonton Southwest Ring Road Projects $100,000,000 Edmonton
Edmonton transit $100,000,000
Edmonton Expansion of the Art Gallery of Alberta (AGA)
*
Edson Expansion and construction of Galloway Station Museum $951,413
Edson Upgrading of Airport Road and related works $850,524
Elnora Elnora Water and Wastewater $181,274
Entwistle Sewage lagoon for Wabamun Lake and west half of Parkland County area residents $1,050,000
Fairview Road resurfacing of Highway 2 $3,218,392
Fairview Sewage lagoon upgrade $169,000
Fairview Highway 682 - Hines Creek Bridge $160,500
Flagstaff Rehabilitation of Battle River Bridge $263,740 Flagstaff, Killam, Beaver Road resurfacing of Highway 36 $4,677,203
Foothills No. 31 498 Avenue extension - Foothills $3,000,000
Fort McMurray Sewer main replacement $2,166,667
Fort McMurray Thickwood Boulevard Interchange and Confederation Way Interchange on Highway 63 $40,000,000
Fort McMurray Improvements to Highway 63 $8,500,000
Fort Saskatchewan Highway 15/21 corridor - City of Fort Saskatchewan $3,000,000
Fort Saskatchewan Generating electricity using renewable biogas $1,043,000
Fort Vermilion Hamlet of Fort Vermilion River road reconstruction $357,223
Forty Mile No. 8 Range Road 60 resurfacing $633,333
Fox Creek Fox Creek wastewater pumping station $1,083,278 Gibbons
Gibbons sewer and pumping station $1,700,501
Grande Cache Grande Cache Recreation Centre $3,000,000
Grande Prairie Paving of Highway 43 $9,081,557
Grande Prairie Grading - Pipestone Creek Road $341,608
Grande Prairie Upgrades to Township Road 714 $370,195
Grande Prairie Trail improvement - O'Brien Provincial Park $25,000
Grande Prairie Prairie Art Gallery restoration project $2,780,000
Grande Prairie Connectivity Infrastructure - Grande Prairie $1,959,440
Greenview Highway 43, North of Fox Creek to East of Highway 947 $2,267,000
Greenview No. 16 Road resurfacing in Grovedale $2,121,173
Grimshaw Sewer extensions $148,333
Grimshaw Street paving $492,804 Halkirk Paintearth Regional Reservoir Project $3,000,000
Hardisty Industrial subdivision $765,181 High Level Sediment disposal system $379,333
High Prairie Reconstruction of 55th Avenue $842,666
High Prairie Reconstruction of 56th Avenue $833,333
High River Grading of Highway 58, Garden River Road: East of Wentzel River to Wood Buffalo Park Boundary $2,291,750
High River 5th St SE Connection $3,000,000
Hinton Water Treatment Plant Upgrade $3,000,000
Holden Wastewater collection system repairs $168,178
Innisfail Innisfail library $2,906,173
Jasper Jasper Activity and Aquatic Centres renovation $1,500,000 Jasper
Jasper Municipal Library renovation and expansion $1,500,000
Kikino Métis Settlement Bridge on Highway 36 rehabilitation $238,465
Killam, Flagstaff Road resurfacing of Highway 13 $1,357,789
Kneehill Rehabilitation of Three Hills Creek Bridge on Highway 21, 10 kilometres south of Three Hills $114,660
Kneehill Selkirk Rural Water Service Area $3,000,000
Kneehill County Highway 836 roadwork $1,768,571 K
neehill County Highway 837 - Resurfacing $1,066,223
La Crete La Crete 100 Avenue and 102 Street Improvements $288,971
Lac La Biche Resurfacing work on Highway 36 $2,326,055 Lac La Biche Resurfacing work on Highway 55 $2,150,041
Lac La Biche East sewage pumping station $616,667
Lac La Biche County Rehabilitation of Highway 881 $2,193,000
Lac Ste. Anne Resurfacing work on Highway 43 $223,570
Lac Ste. Anne Wastewater Lagoon $500,000
Lacombe Resurfacing of Highway 815 $572,203
Lacombe and Ponoka Resurfacing work on Highway 2A $278,000
Lacombe County Highway 12 - Canadian National railway overpass on Highway 12 at Alix $226,500 Lamont County Improvements to Highways 15 and 29 $1,200,000
Lamont County and Smoky Lake County Highway 831 - Resurfacing $479,500
Leduc Selective resurfacing work on Highway 2 $2,555,225
Leduc Selective resurfacing work on Highway 2 $518,826
Leduc Watermain upgrades $243,647
Leduc County Rehabilitation of Highway 622 $1,288,000
Leduc County Rehabilitation of Highway 39 $2,237,000
Legal Water Line Twinning $307,917
Lethbridge Grading of North Monarch Road $542,000
Lethbridge Turin water distribution system $706,633
Lethbridge Improvements to Brown Road $503,607
Lethbridge North County Potable Water Co-op Project $3,000,000
Lethbridge Mountain Meadows Production Well $295,000
Lethbridge Turin Wastewater System $943,100
Lethbridge Community performing arts centre $3,000,000
Lethbridge Scenic Drive North $3,000,000
Lloydminster Installation of sanitary sewer $1,384,460
Long Lake Long Lake Emergency Access Road $199,004
Mackenzie Resurfacing work on Highway 697 $2,501,543 Mackenzie Resurfacing work on Highway 697 $1,334,992
Mackenzie County Highway 58 roadwork $7,292,273
MacKenzie County Highway 88 - Road work $4,349,047 MacKenzie County Highway 88 roadwork $2,836,958
MacKenzie County Paving Highway 88 $1,819,557
Magrath Improvements to Highway 62 $503,725
Magrath Magrath treatment plant and supply system upgrade $1,805,666
Marwayne Infrastructure renewal on South 1st Street $270,417
Mayerthorpe Pumping station, sewers and sewage lagoon upgrades $970,000
Mayerthorpe Highway improvements $182,202
McLennan Rehabilitation of Highway 2, from Highway 679 to McLennan $1,123,313
Medicine Hat Emergency chlorine gas scrubber $500,000
Medicine Hat Highway 1 resurfacing $425,000
Medicine Hat Highway 1 - Eastbound bridge rehabilitation $425,000
Morinville Morinville Community Cultural Centre $3,000,000
Mountain View Resurfacing of Highway 791 from south of Highway 27 to Highway 27 $767,313 Mountain View Resurfacing of Highway 27 $1,194,934
Mountain View County Highway 581 resurfacing $1,489,940 Mountain View County Rehabilitation of Highway 766 $2,080,000
Mundare Mundare Main Street rehabilitation $2,000,000
Nanton Water and sewer upgrades - Nanton $1,200,000
New Norway Resurfacing of Highway 21, from north of Highway 611 to Highway 13 $2,900,000
New Sarepta Improvements to Highway 623 $367,500
Newell Resurfacing work on Highway 556 $2,245,065
Nisku Nisku Spine Road Construction - Phase 1 $2,500,000
Nisku Road reconstruction in Leduc $2,000,000
Northern Sunrise County and Municipal District of Opportunity Highway 88 - Road work $5,150,000 Ohaton Water Infrastructure $356,003
Okotoks Okotoks road work $11,000,000
Okotoks Performing Arts Centre Rehabilitation $333,111
Olds Resurfacing work on Highway 27 $738,157
Olds Resurfacing work on Highway 27 $4,137,237
Olds Olds Municipal Library $1,058,767
Onoway Pumping station rehabilitation $339,150
Onoway Lac Ste. Anne trail sewer replacement $271,600
Parkland Resurfacing work on Highway 16 $568,095
Parkland Road resurfacing of Highway 16 $150,368
Parkland Road resurfacing of Highway 16 $179,795
Parkland and Yellowhead Resurfacing work on Highway 16A $271,698
Parkland County Broadband Connectivity $833,333
Peace River Peace River municipal library $675,401
Penhold Penhold Regional Multiplex Phase II (Library and Lobby) $1,641,368
Pigeon Lake Provincial Park Pigeon Lake Provincial Park sewage system upgrade $518,500
Ponoka Resurfacing work on Highway 2 $580,809
Ponoka Expansion of the Ponoka Lagoon $144,756
Ponoka Grading Township Road 422 $181,750
Ponoka 50 Street Rehabilitation - Town of Ponoka $842,533
Provost Resurfacing of Highway 600 from east of Highway 41 to east of Cadogan $1,075,176
Provost Paving Highway Avenue $180,000
Provost No. 52 Resurfacing on Range Road 14 $2,970,000
Rainbow Lake Home Road Highway water and sewer development $763,385
Raymond Highway improvements $156,863
Raymond Improvements to Highway 845 $313,509
Red Deer Highway 11A Interchange Upgrade (Diamond Conversion) $9,803,000
Red Deer Resurfacing of Highway 2 from south of Highway 2A to south of Bowden $838,679
Red Deer Cottonwood Road and Range Road 270 road resurfacing $848,000
Red Deer Rural road resurfacing $916,667
Red Deer Water treatment plant intake $2,300,000
Red Deer Traffic Signal Control System Upgrade $700,000
Red Deer Red Deer Wastewater improvements $12,000,000
Red Rock Upgrades to Wastewater Treatment in
Red Rock $4,500,000 Redwater Town of Redwater Downtown Storm Sewers $810,000
Redwater Provident Place phase IV renovation - Redwater $454,666
Rimbey Water Storage and Distribution Improvements $1,515,000
Rocky View Replacement of the span bridge in the Western Irrigation District (Langdon) $398,084 Rocky View County Highway 9 $5,000,000
Rocky View County Rehabilitation of Highway 564 $830,500
Rocky View County Rehabilitation of Highway 1 $1,188,500
Rocky View No. 44 Bragg Creek waste water treatment plant and collection system $1,000,000 Rosemary Wastewater pumping station $49,373
Saddle Hills Pillsworth Road grading $476,959
Saskatoon Island Provincial Park Trail enhancements - Saskatoon Island Provincial Park $100,000 Seba Beach 10th Street North Bridge Replacement $23,333
Sedgewick Sedgewick sanitary sewer rehabilitation $956,610
Slave Lake Municipal water treatment and storage improvements $3,000,000
Smoky Lake Resurfacing Highway 855 $1,608,525
Smoky Lake Métis Crossing Historic Site expansion $3,500,000
Smoky Lake County Highway 855 - Resurfacing $517,500
Spirit River Main Street storm sewer $267,358
Spirit River No. 133 Resurfacing of Elevator Road and Cargill Road $336,761
Spring Lake Local roads paving $278,651
Spruce Grove Arterial road network and connection $3,000,000
St. Albert NorthWest Anthony Henday Connector Roads $3,000,000
St. Lina Improvements to Highway 867 $1,344,000
St. Paul Lakeshore Drive-43rd Avenue Reconstruction $569,122
Starland County Highway 575 - Resurfacing $1,546,658
Stettler Resurfacing work on Highway 590 $276,783
Stettler Wastewater treatment facility upgrades $689,847
Stettler Highway 12 - Town of Stettler (various locations) $485,500
Stettler Stettler Resource Road $1,034,742
Stettler Central-East/South-East Region water servicing $3,000,000
Stony Plain West trunk sanitary sewer line $2,325,662
Stony Plain Indian Reserve #135 Rehabilitation of Highway 627 $1,264,114
Strathcona County Highway 14 - Passing lanes construction $402,500
Strathmore Relocation of the Town of Strathmore wastewater treatment plant $933,100
Sturgeon Road resurfacing on Sturgeon River Bridge $222,113
Sturgeon County 195th Avenue (Township Road 542) and 66 and 82 streets $3,000,000
Sundre Water and wastewater servicing -
Sundre $3,000,000
Swan Hills Highway 33 from Swan Hills to south of 18th Baseline $5,771,916
Sylvain Lake Lakeshore Drive stormwater diversion - Sylvain Lake $888,817
Sylvan Lake Main water reservoir expansion $669,406
Taber Stormwater system improvements $2,950,000
Taber Highway 877 - Paving from 1 Kilometre North of Highway 61 to Highway 513 $3,197,600
Taber Enchant water distribution system $1,076,691
Thorhild Correction Line Road $829,852
Thorhild No. 7 Opal Road resurfacing from Township Road 590 to Highway 18 $1,349,333
Three Hills Fire Hall - Three Hills $650,000
Three Hills Grantville Transportation and Drainage Upgrade $921,476
Touchwood Lake Provincial Park Playground at Touchwood Lake $20,000
Turner Valley Sheep River inter-municipal library $983,000
Various Climate Change Research and Development - Phase 1
*
Vegreville Water and sewer conduits projects $327,721
Vermilion Downtown Core Underground and Streetscape Improvements $1,471,017
Vermilion, Lloydminister Road resurfacing of Highway 17 $1,495,000
Veteran Arena upgrade - Veteran $3,103
Vulcan Sewage lagoon relocation $2,203,279
Vulcan County Highway 542 - Widening and overlay $3,375,986
Wabamun 51st Avenue rehabilitation $225,358
Wagner, Widewater Southshore Regional Wastewater Re-use and Green Infrastructure System $1,548,333
Wainwright Water system flush off points $18,256
Wainwright Minburn Road grading $980,000 Wainwright No. 61 Grading of Ribstone Road (Range Road 205) $750,000
Warburg Residential Access Roads Project/Install Water /Sewer Services $400,000
Warner County Coutts Canada/U.S.A. Border Heavy Truck Bypass Road $298,741
Wataskwin and Indian Reserve Ermineskin#138 Resurfacing work on Highway 611 $585,248 Wataskwin and Indian Reserve Ermineskin#138 Resurfacing work on Highway 2A $827,246
Water Valley Rehabilitation of Highway 579 $800,000
West Cove Valking Road - West Cove Drive upgrade project $43,333
Westlock Paving Highway 801 $2,067,606
Westlock Westlock Sanitary Main Trunk Sewer $851,780
Wetaskiwin Yeoford Road - Base and Pave $683,337
Wetaskiwin Bridge rehabilitation - Wetaskiwin $153,718
Wetaskiwin Wastewater facility $1,820,000
Wetaskiwin Waste compaction system $219,934
Wetaskwin Resurfacing work on Highway 13 $1,727,786
Wetaskwin and Ponoka Resurfacing work on Highway 2 $1,766,482
Wheatland Resurfacing work on Highway 24 $2,003,417
Wheatland County Rehabilitation of Highway 21 $871,000
Whitecourt Modernization of the Twin Arenas and Curling Rink $1,155,684
Whitecourt Construction of 49th Avenue $1,169,166
Whitecourt Community resource centre $1,126,060
William A Switzer Provincial Park William A Switzer Provincial Park water system $140,000
Willow Creek No. 26 Brobble Road reconstruction $145,860
Woodland Resurfacing of Highway 658 from Blue Ridge to north of the Athabasca River $913,440 Woodland Resurfacing of Highway 658 $1,270,261
Woodland and Lac Ste. Anne Resurfacing work on Highway 43 $939,523
Woodlands County Water and sewer servicing for Whitecourt Airport and surrounding subdivisions $1,693,450
Worsley Worsley Water Treatment Plant $1,266,666
Yellowhead County Highway 40 - Climbing/passing lanes $3,250,000
Youngstown Youngstown library expansion $76,666
Zama City Zama City Library Facility $480,773
http://www.buildingcanada-chantierscanada.gc.ca/regions/ab/isf-fsi-proj-eng.php