Like the ones who live in Jewtopia are fed the truth and nothing but the truth. lol.
Let's start here.
https://fellowshipoftheminds.com/20...signs-that-school-was-closed-before-massacre/
1. What school’s neighbors said
In an interview with Halbig on Truth Radio Show on March 21, 2014, Infowars reporter Dan Bidondi said (5:45 mark), “The school’s been closed down for God knows how long. [Neighbors] can’t understand why there were kids in that building because it was condemned.”
2. Reports of SHES being contaminated with asbestos, requiring expensive repairs
SHES was built in 1956. Several reports in local newspaper
The Newtown Bee indicate that years before the massacre, SHES was in a state of disrepair and contaminated with environmental toxins.
As examples,
in 2002, Consulting Engineering Services recommended to the school district that SHES be “worked on in 2010 over a nine-month period” to upgrade and renovate its heating and ventilation system at a cost of $4.5 million.Two years later,
in 2004, the Newtown Board of Education was told “there were serious problems with the Sandy Hook elementary school roof.” Four years later,
in 2008, there was yet more bad news: SHES was contaminated with asbestos.
(Remember that 2008 date.)
3. Photographic evidence of an abandoned school
Crime scene photos of the exterior and interior of SHES —
from the website of the State of Connecticut’s Department of Emergency Services and Public Protection, and from a batch of photos that Halbig obtained via Connecticut’s Freedom of Information Act (FOIA), some of which are posted on
James Fetzer’s blog — are consistent with the appearance of an abandoned school.
Moss and grime covered the school building; repairs were left undone. Especially noteworthy, as pointed out
by Fetzer, is a dangerous, exposed metal rod on an exterior staircase (see #3 in photo below):
4. Absence of designated handicapped parking spaces and signage
But we don’t need crime scene photos for visual indicators of a long abandoned school. The many aerial photographic and video images of Sandy Hook Elementary School’s parking lot taken by news media on the day of the massacre would suffice, such as the one below from a CNN news video.
5. Absence of Internet activity 2008-2013
I believe the most compelling evidence that SHES had long been abandoned before the 2012 massacre is the testimony from the Internet Archive’s Wayback Machine of the school’s lack of of Internet activity from the beginning of 2008 through all of 2012.
The Wayback Machine is a digital archive of the Internet which uses a special software to crawl and download all publicly accessible World Wide Web pages. It was
Jungle Server who first discovered that the Wayback Machine shows an absence of Internet activity from SHES since 2008 — the same year when the school was found to be contaminated with asbestos.
To verify Jungle Surfer’s claim, I searched for SHES’s website,
http://newtown.k12.ct.us/~sh, on the Wayback Machine, the result of which is below, showing the school’s lack of Internet activity from the beginning of 2008 to mid-2013. By mid-2013, we are told SHES temporarily had relocated to the nearby town of Monroe, about 9 miles from Newtown. You are invited to replicate and verify what I did
by going here.
6. Halbig’s FOI Hearing
On April 24, 2015, more than two years after Halbig first asked questions about Sandy Hook by phoning and writing letters to Connecticut officials invoking the FOIA, the state finally granted him the first of two hearings before the State of Connecticut Freedom of Information Commission. The respondents were the Newtown Police Department, First Selectman Patricia Llodra, the Town of Newtown, and Newtown’s Board of Education. They were represented by attorney
Monte Frank, a gun-control activist who founded Team 26, a cycling group that lobbies for gun control.
The purpose of the hearing was to determine if Newtown improperly withheld documents requested by Halbig. Halbig claims that he had
requested the following documents from the respondents, but was denied — the denial being a violation of FOIA:
- SHES maintenance work orders, including:
- Copies of all maintenance work orders submitted by SHES principal Dawn Hochsprung (one of Lanza’s alleged victims who, strangely, was interviewed by The Bee about the massacre) or her designee to the school district maintenance department for any repairs, new classroom doors or painting from July 1, 2012 through December 13, 2012.
- Copies signed by Hochsprung or her designee showing the date of completion of the repairs together with time stamps showing job completion.
- Copies of all emails to and from Hochsprung and her assistant to various school district departments, e.g., food services provider, from May 1, 2012 through December 13, 2012.
The requested documents presumably could prove that the school was operational on the day of the massacre.
This is typical of how the collective swallows what it is fed without one question coming to mind. Sheeple would be doing face-palms over your gullibleness.