I may as well post some pictures of the new Wembley Stadium, which should open in about March 2006.
In summer 2002, work began on the 90,000 capacity Wembley Stadium, the new site of the English National Stadium.
--------------
Building in progress.
--------------
The famous 30m high twin towers of Wembley will be replaced with a spectacular 133m high arch towerering over the 52m high stadium.
------------
As well as contributing to overall stadium design, the lattice arch supports the sliding roof structure.
The arch over the stadium was illuminated on 12th September to celebrate the England cricket team winning the Ashes for the first time since 1987.
In summer 2002, work began on the 90,000 capacity Wembley Stadium, the new site of the English National Stadium.
--------------
Building in progress.
--------------
The famous 30m high twin towers of Wembley will be replaced with a spectacular 133m high arch towerering over the 52m high stadium.
------------
As well as contributing to overall stadium design, the lattice arch supports the sliding roof structure.
The arch over the stadium was illuminated on 12th September to celebrate the England cricket team winning the Ashes for the first time since 1987.